Sport facility Arena Armeets, Sofia (main contractor GBS)
Transformer substations MV 10 kV and LV 0.4 kV (total isnstalled power 5000kVA).
Main distribution boards LV with integrated power factor corrector section. Distributions boards for the whole facility.