Телекон Ко

References

Arena Armeets

Sport facility Arena Armeets, Sofia (main contractor GBS)

Transformer substations MV 10 kV and LV 0.4 kV (total isnstalled power 5000kVA).
Main distribution boards LV with integrated power factor corrector section. Distributions boards for the whole facility. 

Arena Armeets

Mall of Sofia

MALL of Sofia - main contractor Lindner Bulgaria
  •  MV and LV electrical equipment (Substations) 
  • Transformer distribution board (TDB), total installed power 10 900 kVA;
  • Main distribution boards (MDB) and floor distribution boards for the entire project.
  • Automation and control of the all electrical systems (SCADA).
Mall of Sofia

Sofia Airport

Sofia Airport reconstruction - 2 units (6 fields) Main distribution boardsLV with total installed power 2 000 kVA.
Sofia Airport