Standard compliance certificates
Arena Armeets
Sport facility Arena Armeets, Sofia (main contractor GBS)
Transformer substations MV 10 kV and LV 0.4 kV (total isnstalled power 5000kVA).
Main distribution boards LV with integrated power factor corrector section. Distributions boards for the whole facility.
Mall of Sofia
MALL of Sofia - main contractor Lindner Bulgaria
- MV and LV electrical equipment (Substations)
- Transformer distribution board (TDB), total installed power 10 900 kVA;
- Main distribution boards (MDB) and floor distribution boards for the entire project.
- Automation and control of the all electrical systems (SCADA).
Sofia Airport
Sofia Airport reconstruction - 2 units (6 fields) Main distribution boardsLV with total installed power 2 000 kVA.
See more